American Dynamics RAS917LS-1 Specifications Page 40

  • Download
  • Add to my manuals
  • Print
  • Page
    / 41
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 39
SPEEDDOME ULTRA VII CAMERA DOME INSTALLATION AND SERVICE GUIDE (8200-0184-01, REV. A1)
40 of 41
Appendix A: Checking
Power and Data for Domes
Using the Standard Base
Check LEDs to verify that power and data are
reaching the dome (Figure 38).
IMPORTANT! To view the LEDs, you will need to
detach the dome from its base. To prevent damage
to the dome, hold the dome by its housing, not its
eyeball assembly.
a. If the power LED (CR33) on the I/O board
glows green, then ac power is connected.
b. Green CR2, red (CR3), and yellow (CR4)
LEDs surround the video connection and are
visible through opening. Check that the
following communication protocols are properly
wired by observing these LEDs.
Manchester: After approximately 20 seconds,
the three LEDs do the following:
Red Green Yellow Possible Cause
Blinking
Steady,
Blinking,
then
Steady
1
Steady,
then
Off
2
White (pin1) and
black (pin 2) correctly
wired.
1
When the network
has been detected.
2
When data for this
dome has been
received. Thereafter,
the yellow LED will
flicker when data is
sent to this dome.
Blinking
Steady,
then
Blinking
Steady
White (pin 1) or white
and black (pin 2)
wires not connected,
or white and black
wires shorted.
Figure 38. Cable connections (Manchester
requires separate cables for data and power)
9-pin plug
LEDs CR2,
CR3, and CR4
visible through
opening.
4-pin plug
Page view 39
1 2 ... 35 36 37 38 39 40 41

Comments to this Manuals

No comments